Case study: Rebuild

Bay and gable removal in Barnehurst

Incorrectly installed UPVC windows have caused the gable brickwork and first floor gable brickwork to drop, thus resulting in in large cracks appearing in the gable brickwork at the junction of the party wall and cracking to the ends of the first floor bay brickwork at the junction of the main front wall. Our engineers came up with this steel beam solution.

  • Case study – rebuilding gable and bay window

  List of case studies